How we work: from idea to handover

Five stages, one point of contact. From the start you know what will be built, what it costs and when it will be finished.

The five stages of your building

  1. Design

    Indicative timeline: 2–4 weeks

    We visit the plot, check the planning data and agree size, height, doors and panels with you. Our engineer prepares the construction design with the structural calculation. At the end of this stage you have a fixed price.

  2. Permit

    Indicative timeline: depends on the town hall

    We submit the design to the town hall for the building permit and prepare the activity documents. We answer any information requests and keep you updated on the application.

  3. Manufacture

    Indicative timeline: 4–8 weeks

    Once the permit is granted, the frame is made to measure in the factory: sections cut, drilled and treated against corrosion. Meanwhile, foundations and slab are built on site.

  4. Erection

    Indicative timeline: 2–6 weeks

    We erect the frame by crane and install the sandwich panel roof and walls, doors and roof lights. A site manager coordinates every day and you get a weekly report with photos.

  5. Handover

    Indicative timeline: 1 week

    We inspect the building with you point by point, fix anything needed and hand over the keys with the completion certificate and technical documentation.

How we erect: sites built by our team in Norway

Steel frame being erected on the concrete slab, with columns and beams in place
Frame on the slab
Crane lifting a steel portal rafter into position
Lifting a portal frame
Installing the sandwich panel walls from inside with a scissor lift
Installing sandwich panels

How we keep to price and timeline

  • The price is fixed at the end of the design stage, when everything is defined. What is not defined cannot be promised.
  • We manufacture in the factory, out of the rain and wind. On site we only assemble.
  • Every stage has an owner and a date. If something is delayed, we tell you before, not after.

Nordic-style project management

In the Nordic countries construction is managed with detailed planning, complete documentation and full transparency with the client. That is how we run every building: a clear schedule, regular photo reports and all documentation handed over at the end.

Quality in every connection

The quality of a building shows in the details: well-made haunches, anchors and flashings. Photos from sites built by our team in Norway.

Haunched portal frame connection between steel column and rafter
Haunched column–rafter connection
Detail of a steel column base plate with its anchor bolt in the slab
Base plate and anchor bolt
Detail of the metal flashing around a red door in the sandwich panel wall
Door flashing in the panel wall

Frequently asked questions

Do I need a building permit for an industrial building in Spain?

Yes. An industrial building needs a major works permit (licencia de obra mayor) from the town hall, with a design signed by a qualified professional. The business activity also needs its own opening or activity permit.

How long does the building permit take?

It depends on the town hall: from a few weeks to several months. We submit a complete design from day one to avoid delays from information requests.

How long does it take to build an industrial building?

Once the permit is granted, a standard building is manufactured in about 4 to 8 weeks and erected in 2 to 6 weeks, depending on size. The exact timeline is fixed in the contract.

Let's talk about your building

Tell us the size, the use and where you want to build. We will send you a fixed-price quote.